韩国三级视频-日韩操-视频一二区-久草欧美-五月天婷婷丁香花-动漫美女靠逼-韩国一区二区三区视频-美女扒开内裤让男人桶-亚洲AV无码精品一区二区三区-无码内射中文字幕岛国片-亚洲成色网

Across China: Tracklayer witnesses transportation expand in Tibet

Source: Xinhua| 2019-04-06 23:38:33|Editor: Mu Xuequan
Video PlayerClose

LHASA, April 6 (Xinhua) -- Braving freezing snow and wind, Wang Quanquan inspects a railway construction site in southwest China's Tibet Autonomous Region, and takes pictures of workers laying the tracks.

Such an inspection is a routine repeated two or three times a day. Wang works for China Railway 11 Bureau Group Co., Ltd, and is designated as head of track laying for the Lhasa-Nyingchi Railway, the first electrified railway in Tibet.

Spanning more than 435 km, the railway, which connects Lhasa, the regional capital, and the city of Nyingchi, forms an important part of the Sichuan-Tibet Railway.

Wang, 44, has witnessed the Tibetan transport system develop. Remote and hard to reach in the past, the region now has a comprehensive modern transport system featuring highways, railways and aircraft.

By the end of 2018, roads had reached all counties in Tibet. In 2006, the Qinghai-Tibet Railway was put into operation. Eight years later, the railway connecting Lhasa, and Tibet's Xigaze, was completed. Tibet now has five airports, with 92 air routes already launched.

From 1980 to 2018, the central government allocated more than 1.2 trillion yuan (184 billion U.S. dollars) in subsidies to Tibet, accounting for 91 percent of Tibet's total expenditure.

More than 15 years ago, Wang volunteered to join the building of the Qinghai-Tibet Railway. It was a tough job, since 85 percent of the railway was constructed in areas more than 4,000 meters above sea level. The areas have an annual average temperature below zero degree Celsius, and oxygen in most of these areas is only about 50 percent to 60 percent of that in plain areas.

Under such harsh conditions, Wang became the head of a team in charge of track laying, a hugely challenging job for a man only 29 years old.

"It was challenging yet meaningful to me," Wang recalled. "The project was simply significant in itself."

It proved to be no easy task under such harsh conditions. Wang was sent to hospital twice due to altitude stress. But the difficulties did not put the man down. In the process, Wang and his team not only managed to carry all the trains up the plateau with cars, but they also made a record by laying more than 8 km of tracks on a plateau in just one day.

"I felt huge responsibility on my shoulders when doing my job, because I cared about the safety of my workers and the safety of the project," Wang said. "When the railway was completed, I cried like a baby."

In May last year, Wang went to Tibet again, to help with laying the tracks of the Lhasa-Nyingchi Railway.

"After the railway is completed, my life will be complete," he said.

TOP STORIES
EDITOR’S CHOICE
MOST VIEWED
EXPLORE XINHUANET
010020070750000000000000011105091379556811
主站蜘蛛池模板: 韶山市| 康马县| 余干县| 大庆市| 浮梁县| 灯塔市| 郸城县| 灌阳县| 观塘区| 延寿县| 广安市| 庆阳市| 重庆市| 镇沅| 自治县| 雷山县| 赤峰市| 高台县| 商水县| 乌审旗| 安新县| 南通市| 新田县| 会东县| 昭通市| 翼城县| 柞水县| 锡林郭勒盟| 宁河县| 滁州市| 那曲县| 莆田市| 贵阳市| 县级市| 宜阳县| 贞丰县| 息烽县| 平利县| 沭阳县| 义马市| 克山县|