韩国三级视频-日韩操-视频一二区-久草欧美-五月天婷婷丁香花-动漫美女靠逼-韩国一区二区三区视频-美女扒开内裤让男人桶-亚洲AV无码精品一区二区三区-无码内射中文字幕岛国片-亚洲成色网

Africa  

Sudan, Ethiopia remain committed to Nile dam agreement: leaders

Source: Xinhua   2018-05-03 11:17:20

KHARTOUM, May 2 (Xinhua)-- Sudan and Ethiopia on Wednesday reiterated their commitment to the 2015 tripartite agreement they signed with Egypt to resolve the dispute on the upcoming Nile dam in Ethiopia.

Sudanese President Omar al-Bashir and Ethiopian Prime Minister Abiy Ahmed made the commitment during their talks in Khartoum.

"We are committed to the Declaration of Principles on the GERD (Grand Ethiopian Renaissance Dam) and to the importance of the tripartite committee," al-Bashir said.

He hoped the tripartite technical committee of Ethiopia, Egypt and Sudan would achieve cooperation in water security and overcome the barriers which halted the technical negotiations.

The Ethiopian prime minister reiterated his country's keenness to enhance strategic ties with Sudan in all fields and to work with Sudan to realize peace and development in the continent.

The last round of tripartite talks on GERD was suspended in April without reaching an agreement on the technical report prepared by French firms on the potential impact of the dam.

In December 2017, Egypt proposed to have the World Bank as a neutral party on the tripartite technical committee, but Ethiopia refused.

GERD, which will cost 4.7 billion U.S. dollars, is now 64 percent complete. Ethiopia hopes the project will provide a constant supply of clean and affordable power and accelerate its shift from an agricultural economy to an industrial powerhouse.

Ethiopia and Sudan eye massive benefits from the GERD construction, while Egypt is concerned it might affect its 55.5-billion-cubic-meter annual share of the Nile River water.

Editor: Li Xia
Related News
Home >> Africa            
Xinhuanet

Sudan, Ethiopia remain committed to Nile dam agreement: leaders

Source: Xinhua 2018-05-03 11:17:20

KHARTOUM, May 2 (Xinhua)-- Sudan and Ethiopia on Wednesday reiterated their commitment to the 2015 tripartite agreement they signed with Egypt to resolve the dispute on the upcoming Nile dam in Ethiopia.

Sudanese President Omar al-Bashir and Ethiopian Prime Minister Abiy Ahmed made the commitment during their talks in Khartoum.

"We are committed to the Declaration of Principles on the GERD (Grand Ethiopian Renaissance Dam) and to the importance of the tripartite committee," al-Bashir said.

He hoped the tripartite technical committee of Ethiopia, Egypt and Sudan would achieve cooperation in water security and overcome the barriers which halted the technical negotiations.

The Ethiopian prime minister reiterated his country's keenness to enhance strategic ties with Sudan in all fields and to work with Sudan to realize peace and development in the continent.

The last round of tripartite talks on GERD was suspended in April without reaching an agreement on the technical report prepared by French firms on the potential impact of the dam.

In December 2017, Egypt proposed to have the World Bank as a neutral party on the tripartite technical committee, but Ethiopia refused.

GERD, which will cost 4.7 billion U.S. dollars, is now 64 percent complete. Ethiopia hopes the project will provide a constant supply of clean and affordable power and accelerate its shift from an agricultural economy to an industrial powerhouse.

Ethiopia and Sudan eye massive benefits from the GERD construction, while Egypt is concerned it might affect its 55.5-billion-cubic-meter annual share of the Nile River water.

[Editor: huaxia]
010020070750000000000000011100001371531801
主站蜘蛛池模板: 井陉县| 晋城| 宜兰市| 巴南区| 枣强县| 通城县| 修文县| 什邡市| 山东省| 苏尼特右旗| 宾川县| 濮阳市| 肥城市| 云龙县| 萨迦县| 崇明县| 磐石市| 临汾市| 平利县| 定结县| 张北县| 阳曲县| 库车县| 南召县| 定南县| 西昌市| 彭州市| 小金县| 贺州市| 梅州市| 舒城县| 定西市| 来凤县| 柳林县| 太白县| 阳泉市| 景德镇市| 门源| 青海省| 浪卡子县| 沈阳市|